The Frisco Public Works Department and third-party contractors will be replacing a culvert located on Pitkin Street/Miners Creek Road. A road closure will be in place from August 11-22, 2025 with a signed detour and variable message signs alerting the public of this closure. Residents are being asked to plan ahead, as crews perform the necessary work, and Frisco Public Works thanks all residents and visitors for their patience, while this vital infrastructure improvement is completed.
Culvert Replacement on Pitkin Street/Miners Creek Road, August 11-22, 2025
A culvert is a structure that allows water to pass beneath a roadway, trail, or similar pathway. Over time, culverts can deteriorate or become undersized, leading to roadway flooding, erosion, or other safety concerns.
This project will involve removing the existing culvert, installing a new culvert that will improve water flow and reduce flood risk, and restoring the roadway surface above the structure.
August 11-22, 2025 Affected Areas
- Pitkin Street will be closed just after the driveway of the 821-residence block to Taylor Trail.
Impacts
- A signed detour will be in place for residents and visitors accessing the Bills Ranch neighborhood and Bayview Townhomes.
- Residents and visitors should access Bills Ranch from Peak One Boulevard onto Miners Creek Road.
- Bayview Townhome residents and visitors may access from Peak One Boulevard onto Miners Creek Road or from Summit Boulevard onto Bayview Drive.
Any questions related to culvert replacement projects may be directed to Town of Frisco Public Works Assistant Director, Greg Munson, at 970-668-9151 or GregM@TownofFrisco.com.
